We have successfully planned, managed and executed both structural civil engineering works as a whole package and building construction projects in sync.
We maintain safety, quality and sustainability at the core of our values.
Construction of formwork including Dowell bars and installation of steel mesh.
3000m2 place and power float concrete. Installation of formwork, mesh and associated joint works.
Break out existing concrete. Place 24m3 of concrete. Ongoing yard maintenance.
Formwork, 23T of reinforcement, 120m3 concrete placed, Powerfloat finish.
Construction of concrete yard slabs and associated infrastructure.